Boulder City Bypass

Client

The Louis Berger Group, Inc.

Services

Biological

Naturally Occurring Asbestos Air Sampling Support

Project Highlights

  • Compliance Monitoring
  • Pre-Construction Desert Tortoise Clearance Surveys
  • Worker Environmental Awareness Training

Deliverables

  • Compliance Monitoring Summary

Project Dates

December 2014 – April 2017

Desert Tortoise. Source: BEC files.

I-11 Boulder City Bypass Phase 2
Compliance Oversight for Desert Tortoise Conservation

Boulder City, Nevada

The Louis Berger Group, Inc. contracted BEC Environmental, Inc. (BEC) to provide biological opinion and compliance support for the construction of Phase 2 of the Interstate 11 Boulder City Bypass Project. The 12-mile highway project connects the existing U.S. Highway 93/95 from Las Vegas directly to the O’Callaghan-Tillman Memorial Bridge.

BEC was assisting in overseeing compliance with conservation and mitigation measures related to the threatened Mojave desert tortoise (Gopherus agassizii) during construction. BEC’s support has included:

  • Assisted in removing tortoises from harm’s way as needed.
  • Conducted preconstruction clearance surveys.
  • Conducted Worker Environmental Awareness Training.
  • Ensured construction activities remain in the cleared area and required mitigation measures are followed
  • Monitored construction activity to ensure compliance with the biological opinion stipulations.
  • Monitored project access routes.
  • Provided information regarding potential environmental issues to construction managers to allow them to maintain schedules and avoid issues.
Site construction activities. Source: BEC files.